Project involved the delivery of a tubular belt conveyor, a yard conveyor with tripper and a transfer tower installed between the two pieces of equipment.
Operating since 2019, the Pampa Sul Thermoelectric Power Plant, located in the municipality of Candiota (RS), is considered one of the most important works aimed at the development of the ...
